The North 60
NYS Environmental
Quality Review (SEQR)

VIEW THE ENVIRONMENTAL FINDINGS STATEMENT

Centrally located in the Town of Mount Pleasant on 80 acres of land adjacent to Westchester Medical Center and New York Medical College, the North 60 is in close proximity to Regeneron Pharmaceuticals, the nation’s fastest growing biotech company. It will feature nearly 3 million square feet of cutting-edge biotech research labs, start-up incubators, eco-friendly office/medical and retail spaces, with access to the nation’s most highly educated and skilled workforce.

The $1.2 billion project will generate thousands of new high-paying careers in bioscience, healthcare and research, plus support a steady stream of construction, hospitality and retail jobs. It will also create career opportunities for students in the emerging bioscience field by forming partnerships with nearby Westchester Community College, Pace University and New York Medical College.

The North 60 will be designed to create a strong sense of place with a pedestrian-friendly Main Street lined with shops, a hotel and conference center, restaurants with outdoor dining and landscaped plazas as gathering places. It will be a walkable and interconnected community with sidewalks, paved multi-use paths, pedestrian bridges and bikeways connected to a regional bike network.


State Environmental Quality Review Act (SEQRA) Findings Statement

The North 60 SEQRA Findings Statement - Accepted on 5/5/22 (PDF, 2.7MB)


View the Final Environmental Impact Statement (FEIS)

Download and view the main FEIS document and supporting appendices below.

The North 60 FEIS (PDF, 4.4MB)

A. Appendices Cover and TOC (PDF, 0.5MB)

A1. NORTH 60 - PUBLIC HEARING (9_3_2020)4PPI (PDF, 0.2MB)

A2. NORTH 60 - PUBLIC HEARING (9_3_2020)FI (PDF, 0.3MB)

B. NORTH 60 - PUBLIC HEARING - Vol. 2 (10_1_2020) (PDF, 0.2MB)

C. Letters and Written Comments (PDF, 6.8MB)

D. Vegetation and Wildlife Survey Supplement (PDF, 0.4MB)

E. Traffic Plan (PDF, 0.4MB)

F. Traffic Appendices

ATTACHMENT 1 Build Analysis w Aquest Development (PDF, 1.9MB)

ATTACHMENT 2 US Census Data-ITE Parking Rates (PDF, 0.4MB)

ATTACHMENT 3 TMC - ATR Comparison Table (PDF, 0.1MB)

ATTACHMENT 4 NYSDOT Historical Data (PDF, 0.4MB)

ATTACHMENT 5 Other Development Traffic Information (PDF, 1.1MB)

ATTACHMENT 6 Traffic Count Data (PDF, 0.1MB)

ATTACHMENT 7 Sensitivity Analysis - NYS Route 9A SMRP NB On-Off Ramp (PDF, 1.2MB)

ATTACHMENT 8 Update Bradhurst Ave-Broadway-Memorial Dr Intersection (PDF, 0.6MB)

ATTACHMENT 9 Pedestrian Figures (PDF, 1.0MB)

ATTACHMENT 10 Traffic Signal Timing Plans (PDF, 130.2MB)

ATTACHMENT 11 NYS Route 100C-Woods Rd-Taylor Rd - EB Left Turn Storage (PDF, 7.9MB)

ATTACHMENT 12 Conceptual Improvement Plans (PDF, 8.9MB)

ATTACHMENT 13 LOS Summary Tables (PDF, 0.2MB)

ATTACHMENT 14 Additional Accident Information (PDF, 0.5MB)

ATTACHMENT 15 Turning Tracks (PDF, 2.0MB)

ATTACHMENT 16 Sight Distances (PDF, 1.9MB)

ATTACHMENT 17 Turning Tracks (PDF, 8.3MB)

ATTACHMENT 18 WMC NYMC WCDOC Interplay Credit (PDF, 11.8MB)

G. Former Nilsson Greenhouses Sampling Investigation (PDF, 2.5MB)

H. Phase II Archeological Site Evaluation (PDF, 20.5MB)

I. Visual Simulations (PDF, 10.6MB)

J. Conceptual Site Plans (PDF, 8.3MB)

K. Street Sections (PDF, 7.9MB)

L. Emergency Services (PDF, 0.3MB)

M. Tree Planting Plan (PDF, 49.2MB)

N. Stormwater Pollution Prevention Plan (PDF, 13.7MB)

O. Draft Zoning Text Amendment (PDF, 0.1MB)

P. North 60 Phase 1 Plan Set (PDF, 42.2MB)

Q. N 60 Tree Removal Plan Phase 1 (PDF, 6.8MB)

R. Westchester Dept of Env Facilities (PDF, 0.1MB)

S. Geotech-Retaining Wall Foundations (PDF, 3.3MB)

T. West Street Alternative (PDF, 0.7MB)

U. Case Examples of Bio-Tech or Similar Campuses (PDF, 0.6MB)