NOVA Traffic Operations Practices
Flow Chart for Permit Signals - NOVA Signal Design and Construction Process (Adobe PDF, 0.1MB)
NOVA Permits Process for Traffic Signal Construction (vdot.virginia.gov)
TE-306.1 Yellow Change Intervals and Red Clearance Intervals (vdot.virginia.gov)
TE-306.1 FAQ Version 1.0 (Adobe PDF, 2.5MB)
NOVA Detector Placement Standard for Traffic Signal Design (Adobe PDF, 0.1MB)
NRO Initial Timing Data Best Practices (Adobe PDF, 0.1MB)
NRO Guidelines for Traffic Signal Timing Plan Submission Process (Adobe PDF, 0.1MB)
Signal Timing Review Process for Permit Projects (Adobe PDF, 0.3MB)
Top Ten Signal Design Issues Checklist (Adobe PDF, 0.3MB)
NRO Bicycle Marking Reference Guide (Adobe PDF, 0.2MB)
NRO Change and Clearance Interval Data Collection Processing Best Practices (Adobe PDF, 1.5MB)
NOVA District Pavement Marking Reference Guide 2025 (Adobe PDF, 0.5MB) NEW!
NRO TEP 301.1 Pavement marking at intersections (Adobe PDF, 0.2MB)
NRO TEP 303.1 Hatch marks (Adobe PDF, 0.2MB)
NRO TEP 401.1 Ped crossing time (Adobe PDF, 0.1MB)
NRO TEP 403.1 Pedestrians at signals (Adobe PDF, 0.1MB)
NRO TEP 406.2 Clearance intervals (Adobe PDF, 0.1MB)
NRO TEP 701.1 School Zone Speed Limits (Adobe PDF, 0.1MB)
NRO TEP 901.1 BMUFL _Sharrows (Adobe PDF, 0.2MB)
NRO TEP 902.1 Signing and Marking For Sidewalks and Sidepaths (Adobe PDF, 0.1MB)
Home
VDOT Traffic Operations Division